How Long Does It Take for Ready Mixed Concrete to Set?

Concrete has traditionally been prepared on job sites. Here, it necessitates a lot of work and increases the likelihood of human error.

The integrity of structures depends on a correctly mixed batch of concrete. Preparing concrete mixtures on-site cannot guarantee that each batch contains the proper proportions of cement, water, and aggregates.

As a result, RMC was brought to the construction sector as advanced technology with a high level of mechanization and automation. As a result, each concrete batch contains the correct amounts of elements, ensuring the finest possible results.

If you need ready-mix concrete, you only need to get in touch with reputable ready-mix concrete suppliers, and they will deliver the concrete to your job site, and all you need to do is install it.

Cement is the main component of concrete.  Cement initiates a hydration reaction when it comes into touch with water. It is responsible for the hardening of cement.

As a result, understanding the setting time of ready mixed concrete is critical for optimal operation. The time it takes for concrete to set will dictate how to schedule the work list for optimal results.

How long does it take for ready-mixed concrete to set?

As previously stated, the main component of concrete is cement. Cement begins to solidify when water is put into it. RMC consists of cement, water, and aggregates. RMC is made at batching facilities by adding water to a dry mix of cement and aggregates. As a result, the cement is activated, which initiates the hardening process.

If the concrete is not poured before it has set, it will lose its effectiveness over time. The RMC setting indicates its hardened state. The concrete batch will be considered waste if it gets hardened before being used on a job site. So, it is imperative to know when the concrete will be set.

While this is the case, unlike site-mixed concrete, RMC has a specific setting time. There are numerous variations between site-mix concrete and ready-mix concrete. The setting time varies according to the mixture type.

The RMC setting time can be classified into two groups. These are:

1) Initial Setting Time,

2) Final Setting Time.

The concrete begins to harden as soon as water is added to the cement mixture. RMC is transported by cement trucks. These trucks contain revolving drums or vessels that transport the RMC. The RMC must be constantly agitated and mixed as it travels from the batch factory to the project site.

Initial setting time

The initial concrete setting time is around 210 minutes. So, you must use the RMC within 210 minutes after preparation in batching plants. It becomes a race against the clock to convey the RMC on time. You can sometimes ask the delivery company to add admixtures to the concrete mix to delay setting time and allow it to travel longer distances.

That is why local Ready Mix Concrete suppliers are essential. The concrete trucks must be able to deliver within the stipulated time frame, or the concrete will lose its effectiveness. Remember that too much delay may render the concrete utterly ineffective.

Final setting time

Technically, concrete never stops hardening. Concrete will continue to harden eternally. While this is the case, it reaches a point where further hardening is extremely sluggish and undetectable after a certain time.

In conventional industrial applications, full-strength concrete is allowed after 28 days. When properly cured, concrete reaches 70% of its full strength within one week.

After the final setting time, the concrete mixture completely loses its plasticity. The concrete hardens and takes the shape in which it is cast. Any form or scaffolding can be removed after the final setting time.

Concrete’s complete setting time ranges from 24 to 48 hours, depending on the conditions. At this point, it is safe to walk across the concrete without leaving tracks. You should note that you should keep the concrete free of heavy machinery during this period.

What factors affect the setting time of RMC

There are several aspects to consider when determining the setting time of ready-mix concrete. They are:

Moisture: This is a crucial factor in the curing period of ready-mix concrete. If there is insufficient water in the mix, the concrete will cure quickly, resulting in a lower overall strength.

On the other side, excessive moisture weakens the top layer and causes peeling.

High ambient temperatures or strong winds can accelerate moisture evaporation. It has the potential to reduce the amount of time required to set the RMC.

Admixtures: Ready-mix concrete may contain admixtures of several accelerant types. Because some job sites require concrete to be used as quickly as feasible, accelerants can shorten the setting period of concrete while providing a lower overall strength in the end. While this is the case, it will still meet the conventional strength criteria.

Certain admixtures might cause ready-mix concrete to take longer to set. Since job sites are not always close to batching plants, the vehicles take longer to distribute the mixture.

The water-to-cement ratio has a considerable impact on the concrete’s setting time, performance, and quality. Ready Mix Concrete typically has a fixed setting time set by the manufacturer.

When concrete is mixed on-site manually, the setting time varies depending on the cement-to-water ratio. So, inquire with the concrete delivery professional about the time you intend to purchase the Ready Mix Concrete.

Concrete mixes with lower water-to-cement ratios have shorter setting times. Working with these combinations can be more difficult because all procedures must be completed as quickly as possible.

Concrete mixes with a higher water-to-cement ratio take longer to set. This allows you to spend more time working with the mixture.

Parting shot

Now you know the time it takes for concrete to settle. For the best outcome, ensure that you get high-quality concrete from a reputable ready-mix concrete delivery Potomac company. You should also focus on proper curing processes to ensure your concrete’s durability and strength.

Proper curing has a considerable impact on concrete’s final performance, particularly its resistance to wear and cracking. To optimize your results, keep the moisture level steady during the curing process.

Moisture retention keeps the concrete from drying out too soon, which can cause surface fractures and undermine the structure. You can accomplish this by covering the concrete with a damp burlap or a plastic sheet, keeping the surface moist. Re-wet the burlap on a regular basis, especially during hot, dry weather.